Pond Bridge Repairs and Maintenance
Hackney Council Parks Department have informed us that Clapton Pond bridge will be closed for repairs and maintenance for 21 days – from 20 August until 17 September.
Work will include:
- Tackling areas of corrosion – cleaning and applying a suitable protective coating
- Decking – Cleaning and applying a suitable, non-toxic preservative to prolong the life of the bracing.
- Deterioration to the decking tongue and groove – Cleaning the cladding panels and applying a non-toxic coating system.
- Repairs to, and replacements of, elements of the parapet