Pond Bridge Repairs and Maintenance

Last modified date

Hackney Council Parks Department have informed us that Clapton Pond bridge will be closed for repairs and maintenance for 21 days – from 20 August until 17 September.

Work will include:

  • Tackling areas of corrosion – cleaning and applying a suitable protective coating
  • Decking – Cleaning and applying a suitable, non-toxic preservative to prolong the life of the bracing.
  • Deterioration to the decking tongue and groove – Cleaning the cladding panels and applying a non-toxic coating system.
  • Repairs to, and replacements of, elements of the parapet

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.